From the beginning the challenges that were faced included a small-time frame and tight budget constraints. The wire bin panels from the hospital weren’t required to be mounted until they were sure it would work in the new hospital once fully operational.

The challenged faced prompted a unique solution where Select designed bespoke free-standing racks with attached wire bin panels to avoid having to mount the wire bins.

The sales team at Select were able to work closely alongside with the project team to ensure that all stakeholder requirements were met with helpful solutions and specialist’s knowledge. The product supplied allowed for a flexible design that the facility utilised for multiple  applications and departments while providing a uniform  approved system that met infection control standards and storage capacity
levels specifically needed for the facility. It was a unique situation that called for a custom solution that was efficient and the Select team were able to solve quickly. The outcome was a success, and the hospital didn’t have to compromise on time and money that wasn’t available.

What challenges were being faced?

Challenges faced involved a small-time frame and tight budget constraints all at the construction site. They didn’t require wire bin panels mounted in the hospital until they were sure it would work for them once they were operational.

What were the key features of the product?

Flexible design allowed the facility to utilise the frames in multiple applications and departments while providing a uniform approved system that meets infection control requirements and storage capacity for the facility.

Any other key reasons for choosing Select?

The consultation process with the sales team and the way they worked very closely with the project team onsite to ensure that all stakeholder requirements were met.

View or save the PDF version of this case study here.